×
Rissington Bridge

Rissington Bridge

Category:


The Brief

This project involved reconstructing the retaining walls on an existing bridge following the heavy floods of 2007. In a very tight site due to maintaining traffic flows we used a 60T crane to lift the units into place.

Walsh used a Sub Contract diving team to prepare the formation and place the units and they were faced in Cotswold stonework with stone copings. The works were completed in the tight timescales.