Bradford On Avon Landslide


The Brief

Walsh were appointed as Principal Contractor at a logistically challenging site in Bradford on Avon.

Due to a large landslide several domestic properties were affected and Walsh were employed to make the land safe by working with design teams and a team of specialist sub contractors and field experts.

Unusual methods such as a moving conveyer through a domestic property helped to both bring in and take away materials to site. The 5 property’s and their land have now been reinstated to their original state pre landslide.

Please check out the last 2 pictures – before and after