Walsh were appointed as Principal Contractor at a logistically challenging site in Bradford on Avon.
Due to a large landslide several domestic properties were affected and Walsh were employed to make the land safe by working with design teams and a team of specialist sub contractors and field experts.
Unusual methods such as a moving conveyer through a domestic property helped to both bring in and take away materials to site. The 5 property’s and their land have now been reinstated to their original state pre landslide.
Please check out the last 2 pictures – before and after